Steven worked hard to finish the varnishing of our rudder and control handle. He had to engineer a sophisticated drying device to allow him room to paint both sides while not sticking to one side or the other.
Chris worked to finish the cutout portions of our flooring which will wrap around existing structrual pieces and still provide ample standing room.
Next week will be a big week, we hope to have the flooring attached both in the cabin and the stern of the boat, as well as attach a lot of hardware before flipping the boat over on Thursday to work on the outside of the hull!
No comments:
Post a Comment